Information sought as part of request
About the Property
Plot Area in sq.m.
Type of Property – i.e. permitted use category such as Industrial, Commercial, etc.
Type of Activity – i.e. Engineering, Electronics, Fabrication, etc.
Built up Area as per Building Completion Certificate
About the Sub-Let
Area to be Sublet
Area required for original allotee’s operations, if both operations are going to run in parallel
Name & Contact Details of the proposed Sub-lettee
Activity type of proposed Sub-lettee (Industrial, Commercial, etc.)
Project Report of Sub lettee operations
Employment Generation skilled and unskilled
Power requirement – Connected & Max Loads
Water Consumption – Ltr./day
Effluents
Treatment &Disposal plan for effluents
Period of Sub-letting
REquest Letter from Sub-Lettee with constituion of firm
Registered Leave & License agreement
Plan showing clearly the area proposed to be subletted
Date of desired occupation
Clarity on open area subletting (if required)